Cleaning after construction works
Find a cleaning agency in your city
Cleaning agencies after construction works in Montenegro
Frequently Asked Questions
How much does it cost to clean an apartment after renovation?
The price is usually calculated per square meter and depends on the condition of the space, the type of flooring and the amount of remaining paint, glue and plaster. The apartment after partial renovation costs significantly less than the building after the final works on the new building. Most agencies give an exact offer only after a tour or based on photos.
How long does it take to clean up after construction work?
For a medium-sized apartment, usually one working day with a team of two to three people. Larger objects and areas with a lot of leftover material require two to three days, because the dust settles and a second pass is required.
What does post-construction cleanup include?
Removal of construction dust from all surfaces, removal of paint, glue and silicone residues, washing of windows with frames and roller boxes, cleaning of toilets, radiators and sockets, and final machine washing of floors. Removal of large construction waste is usually arranged separately.
Should the contractor clean the area for me?
As a rule, contractors remove their waste and tools, but detailed cleaning is usually not included in the price of the work. Check what is written in the contract — in most cases, the investor hires the agency separately, before handover or moving in.
